2025-0188 Palm oil mill electrical upgrade
C3Accept

Open engineering items

Every abstention, conflict, drift detection and check failure lands here. Nothing is dropped on the floor, and a gate consults this register directly.

SRS section 12.4, open engineering items

Critical

0

High

0

Medium

0

Low

0

Waiving an item is a C4 approval, not a C2 update. Deciding that a known problem will not be fixed carries the same authority as passing a gate, because in practice it is the same decision made earlier.
Register
The same items as a flat table for export or review.

Nothing to show yet.