Acting as EngineerC3Accept
Nusantara Nickel Smelter, E-House and LV distribution package
PT Nusantara Nickel Industri, contract NNI-EPC-2026-114, Morowali, Central Sulawesi.
PRJ-2026-0045, created 2026-05-04
approved
Project record
- Identifier
- PRJ-2026-0045
- Project code
- 2026-0045
- Contract
- NNI-EPC-2026-114
- Project manager
- Rangga Prasetyo
- Engineering lead
- Dewi Anggraini
- Site
- Morowali, Central Sulawesi
Systems
3
Second level of the hierarchy.
Configured items
3
Each maps to one upstream configuration.
Requirements
12
Extracted, canonised and traced to a source anchor.
Open items
8
Unresolved questions, conflicts and check failures.
Systems
A system groups configured items that are commissioned together.
| Code | System | Discipline | Description | Items |
|---|---|---|---|---|
| 01 | Main LV distribution | Electrical | Main switchboard, distribution boards and the interconnecting busway. | 2 |
| 02 | Motor control | Electrical | Motor control centres serving the ore handling and dust extraction plant. | 1 |
| 03 | Control and monitoring | Instrumentation and Control | Metering, protection relays and the plant communication interface. | 0 |
Configured items
Each item carries a full configuration snapshot with a content hash, so drift is detectable rather than assumed away.
Gate readiness
Evaluated live against the record. A gate is a completion contract at project scope, not a checkbox.
| Gate | Name | Tracer scope | Ready |
|---|---|---|---|
| G1 | Requirement baseline | Deferred | 3 outstanding |
| G2 | Configuration freeze | Deferred | 2 outstanding |
| G3 | Design release | Deferred | 1 outstanding |
| G4 | Manufacturing release | In scope | 6 outstanding |
| G5 | FAT release | In scope | 5 outstanding |
| G6a | Integrated system test | Deferred | 1 outstanding |
| G6b | Site acceptance test | Deferred | 1 outstanding |
| G7 | Handover | Deferred | 1 outstanding |
Requirements needing attention
Anything still below L3 cannot support a gate decision.
| Reference | Statement | Criticality | Trust |
|---|---|---|---|
| SPC 3.6 | The design ambient temperature shall be 65 C. | High | L1 |
| SPC 3.7 | The assembly shall provide adequate protection for operating personnel in the event of an internal arcing fault. | Critical | L1 |
The hierarchy shown here is the one the specification fixes in section 5.1. Nothing in this sandbox creates an engineering object outside a configured item, because an object with no configuration behind it cannot be checked against anything.